The Minister of Works and Housing, Babatunde Fashola, on Wednesday, confirmed that the construction of the 2nd Niger bridge is now completed and will soon be released to the public for use.He stated this at an ongoing press briefing to present the President, Major General Muhammadu Buhari’s (retd.) scorecard in Abuja.
He said, “I can confirm that the second Niger bridge itself is finished. People can walk through the bridge now unimpeded. What remains is the four-kilometer link road on the Asaba side.“Right now, our dredger is in place, we have to rebuild the road by reclaiming sand, the recent surge of flood has slowed us down.
On the Onitsha side, there is a 7kilometer road that links the bridge and the Onitsha-Owerri interchange.”
Rice, a staple for Christmas celebrations in Nigeria, has become a luxury this year. Soaring…
Panic erupted on Saturday at a concert in Lagos when the stage collapsed during Odumodublvck’s…
The Federal Government of Nigeria has allocated ₦6,364,181,224 billion for the refurbishment and rehabilitation of…
The black market dollar to naira exchange rate for today, 22nd December 2024, can be…
The Nigerian National Petroleum Company Limited (NNPCL) has refuted claims that the 60,000 barrels per…
Manchester City finds itself in unprecedented turmoil, with relegation-level form showing little sign of improvement.…